END USER MARKETS: PROCESS PLANTS: PHARMA
Pharmaceutical companies prepare sound Safety & Health Management Systems
based on OSHAS/ISO 18000 standards.They formalized Safety Policy, conduct
safety training as per prepared training manuals, compile Material safety
Data Sheets for all chemicals and raw materials, organize pre start-up safety
during commissioning of equipment and systems develop Management of Change &
change control procedures, Hazop Study and Risk assessments, root cause
analysis, emergency preparedness and response, mock drills. Prepare Plant
Safety, Laboratory Safety & Bio safety manuals, implement Safety Permit
Systems, Conduct periodic safety audits, prepare Documentation of Accidents
and near miss accidents and incidents, and Finalize PPE as per industry
standards such as USDA/3A/FDA/GMP. Whatever types of operations your business includes - single- or multi-line,
continuous or batch, a majority of the loops are critical to plant
operations. Whether it is critical from a safety, environmental or economics
basis, utilizing the IEC 61511 process to design your control systems makes
sense. With increasing social and economic pressures, the legislation in various
countries is becoming more stringent. These issues are addressed to a great
extent by insuring that the safety instrumented systems are specified,
designed, installed, operated and maintained as per appropriate and well
recognized safety standards. |