END USER MARKETS: PROCESS PLANTS: UTILITY
The Power market has been analyzing the utilzation of IEC61508 and IEC61511 as well as considering tha adoption and integration of the ANSI/ISA 84 standard to: Process Boiler (NFPA 85)
Fired Process Heater (API 556)
Incinerator (NFPA 86)
Oil Treater Heater (API 14C)
Glycol Reboiler (API 14C) Plus:
FM7-45
NFPA 85, 86
API RP 556
British Health & Safety Executive Board (HSE)
Black Liquor Recovery Boiler Advisory Committee
EN 50156-1 Electrical equipment for furnaces and ancillary equipment Exida has been working with the Power and Energy market for 6 years to support this analysis as well as implementation and support for many applications. Their experience with Power and Energy applications include:
- HAZOP (PHA) study of coal-fired power station (main plant) , SIL selection (LOPA) of main plant & SIL verification of feed pump critical functions. Development of Safety Requirement Specification (SRS) for feed pump safety instrumented functions.
- HAZOP (PHA) study of coal-fired power station (water treatment), SIL selection (LOPA) of water treatment & SIL verification of water treatment critical functions. Development of Safety Requirement Specification (SRS) for water treatment safety instrumented functions. Design review and vendor evaluations.
- HAZOP (PHA) study of coal-fired power station (SO3 plant) , SIL selection (LOPA) of SO3 plant & SIL verification of SO3 plant critical functions. Development of Safety Requirement Specification (SRS) for SO3 plant safety instrumented functions.
- HAZOP (PHA) study of Combined Heat & Power (CHP) plant. Functional Safety Training (CFSE) and Process Safety Training (SIS Operations & Maintenance and Alarm Management)
- Hazard Identification (HAZID) of various gas turbine engine models, Functional Safety Training (CFSE)
Other projects include:
- Scrubber Reliability and LCC Review
- Turbine Governor IEC 61508 Certification
- Furnace SLC Design and SIL Analysis and Verification
- BMS SIL Design and Analysis
- SIL Design, Analysis and Verification
- Nuclear Plant IEC61 508 and 613 Training, Safety Case Database Architecture review, Qualification, HMI Process Gap analysis, Final documentation review and verification training
- Nuclear guideline co-authoring for Field Instrument Qualification
- Reformer and Reheat Furnace SIL Selection and Verification
|
|
 |
 |
|