END USER MARKETS: PROCESS PLANTS: UTILITY

The Power market has been analyzing the utilization of IEC 61508 and IEC 61511 as well as considering the adoption and integration of the ANSI/ISA 84 standard to:

Process Boiler (NFPA 85)
Fired Process Heater (API 556)
Incinerator (NFPA 86)
Oil Treater Heater (API 14C)
Glycol Reboiler (API 14C)

Plus:
FM7-45
NFPA 85, 86
API RP 556
British Health & Safety Executive Board (HSE)
Black Liquor Recovery Boiler Advisory Committee

EN 50156-1 Electrical equipment for furnaces and ancillary equipment Exida has been working with the Power and Energy market for 6 years to support this analysis as well as implementation and support for many applications.

Their experience with Power and Energy applications include:

  1. HAZOP (PHA) study of coal-fired power station (main plant) , SIL selection (LOPA) of main plant & SIL verification of feed pump critical functions. Development of Safety Requirement Specification (SRS) for feed pump safety instrumented functions.
  2. HAZOP (PHA) study of coal-fired power station (water treatment), SIL selection (LOPA) of water treatment & SIL verification of water treatment critical functions. Development of Safety Requirement Specification (SRS) for water treatment safety instrumented functions. Design review and vendor evaluations.
  3. HAZOP (PHA) study of coal-fired power station (SO3 plant) , SIL selection (LOPA) of SO3 plant & SIL verification of SO3 plant critical functions. Development of Safety Requirement Specification (SRS) for SO3 plant safety instrumented functions.
  4. HAZOP (PHA) study of Combined Heat & Power (CHP) plant. Functional Safety Training (CFSE) and Process Safety Training (SIS Operations & Maintenance and Alarm Management)
  5. Hazard Identification (HAZID) of various gas turbine engine models, Functional Safety Training (CFSE)

Other projects include:

  1. Scrubber Reliability and LCC Review
  2. Turbine Governor IEC 61508 Certification
  3. Furnace SLC Design and SIL Analysis and Verification
  4. BMS SIL Design and Analysis
  5. SIL Design, Analysis and Verification
  6. Nuclear Plant IEC61 508 and 613 Training, Safety Case Database Architecture review, Qualification, HMI Process Gap analysis, Final documentation review and verification training
  7. Nuclear guideline co-authoring for Field Instrument Qualification
  8. Reformer and Reheat Furnace SIL Selection and Verification