United States
Change Country Homepage
  • Canada
  • Japan
  • Mexico
  • Netherlands
  • South Africa
  • United Kingdom
  • Member Login
  • |
  • Safety Automation Element List
  • |
  • Contact
  • |
  • COMPANY
    • About Us
    • Locations
    • Key Consultants
    • Clients
    • Career Opportunities
  • SERVICES
    • Certification
    • End User
    • OEM
    • Security
    • Alarm Management
  • SOFTWARE
    • exSILentia
    • PHAx
    • SILAlarm
    • SILStat
    • SERHViewer
    • Software Support
    • All Software
  • TRAINING
    • Course Dates
    • Online Training
    • On-Site Training
    • Virtual Classroom
  • WEBINARS
    • About
    • Scheduled Webinars
    • Recordings
    • Webinar Wednesdays
  • BOOKS
    • Alarm Management for Process Control
    • Certified Functional Safety Expert / Professional (CFSE / CFSP) Study Guide
    • Control Systems Safety Evaluation and Reliability, 3rd Edition
    • Electrical & Mechanical Component Reliability Handbook, 3rd Edition
    • Final Elements and the IEC 61508 and IEC 61511 Functional Safety Standards
    • Functional Safety - An IEC 61508 SIL 3 Compliant Development Process, 2nd Edition
    • Practical SIL Target Selection - Risk Analysis per the IEC 61511 Safety Lifecycle
    • Safety Book Package
    • Safety Equipment Reliability Handbook - 3rd Edition
    • Safety Instrumented Systems Verification - Practical Probabilistic Calculations
  • RESOURCES
    • Safety Automation Element List
    • Features
    • Brochures / Flyers
    • White Papers
  • WEB STORE
  • BLOG

Blog - exida explains

exida : Blog : A look into the control room of the Fukushima Dai-Ichi Unit 2 reactor!
tstauffer's photo
Todd Stauffer
Director of Alarm Management Services

A look into the control room of the Fukushima Dai-Ichi Unit 2 reactor!

Wednesday, March 30, 2011

Viewed 6534 times

Alarm Management • (0) Comments • Permalink

I came across an interesting blog post the other day…

Talk about operating blind.  A great picture shows the status of the control room in the Fukushima Dai-Ichi Unit 2 reactor…Nothing is working (besides the lights)!

All of the computer monitors are blank. The clock is dead. None of the equipment status lights and gauges appears to be functional. None of the annunciator windows are lit—and the plant is far from a condition where no parameters are in alarm status.

Compare this to the picture of the NRC’s Boiling Water Reactor (BWR) Control Room simulator (taken in 2009).

It seems as though control rooms in the US Nuclear industry really haven’t evolved very much since the 1970s. Some would argue that operators were better in tune with the process (situation awareness) in this control room design, as compared to the modern control room of the chemical / petrochemical plant with banks of PC monitors.  That’s the challenge for the modern day HMI / control room designer - to create the same level of operator situation awareness (or better) using different technology.

Tagged as: todd stauffer, nrc, hmi, fukushima dai-ichi unit 2 reactor, bwr, boiling water reactor,

(0) Comments

    You Must Be Logged In To Comment

    Become a Registered Member

Blog RSS Feed

  • Click to Subscribe

Categories

  • Alarm Management (7)
  • Control System Security (10)
  • Failure Data (15)
  • Functional Safety Certification (37)
  • General (6)
  • Layer of Protection Analysis (LOPA) (2)
  • News (1)
  • Proof Testing (1)
  • Risk Communication (7)
  • Safety Instrumented System (1)
  • Software (9)

Most recent entries

  • The exida SchemeAdded 5 days ago
  • Root Cause AnalysisAdded 14 May 2013
  • Certificate Forgery!Added 09 May 2013
  • Which Edition of IEC 61508 is Relevant to Me?Added 07 May 2013
  • Setting the PaceAdded 02 May 2013
  • How Do You Certify to IEC 61508?Added 30 April 2013
  • Practice Makes Perfect…AlmostAdded 25 April 2013
  • PHA: A must or a MUST?Added 24 April 2013
  • Setting up for FAILUREAdded 18 April 2013
  • The Human Element of Functional Safety (The Challenge)Added 10 April 2013
  • A 100% Pass Rate!Added 03 April 2013
  • Changing the PVST Interval. Hey, my Architectural Constraints changed!Added 21 March 2013
  • Changing the PVST Interval. Hey, my failure rates changed!Added 20 March 2013
  • That is impossible! It has never happened before…Added 13 March 2013
  • Define the Safety Function for a Better CertificationAdded 11 March 2013

Contact exida

Germany +49-89-49000547
USA +1-215-453-1720
South Africa +27 31 2671564
United Kingdom +44 (0) 2476 214 794
Canada +1-403-475-1943
Mexico +52-55-1-5-18-05-73
Asia +65 6222-5160

Stay Informed

  • Get Updates Via Facebook
  • Follow us on Twitter
  • Youtube Channel
  • RSS Feed of exida News

Resources

Safety Automation Element List
Blog
Features
White Papers
Company Brochures
Web Seminars

Newsletter

Receive our FREE Newsletter that goes out to over 5,000 industry professionals every month

Copyright 2000 - 2013 . exida.com LLC | Site Map