Site integration test. Once site acceptance testing is completed, the basic process control system and the safety instrumented system (SIS) communications and any hard-wired links are integrated and tested as a complete system to ensure that the system as a whole functions correctly. SIS signals, diagnostics, bypasses and alarms displayed on shared basic process control system human machine interface (HMI) screens will be tested during this stage.